A firm that is considering GIPS compliance is considering verification too. The firm can seek to have a detailed Performance Examination:
A) on select composites only after the whole firm has been verified.
B) only on all composites as part of the firm wide verification.
C) on select composites as part of the firm wide verification.
The correct answer was A.
Section III.C: After the firm has been verified, as evidenced by a verification report, it may additionally choose to have a detailed Performance Examination conducted on one or more specific composites
I don’t see this anywhere. Could someone expand on this?
A) on select composites only after the whole firm has been verified.
B) only on all composites as part of the firm wide verification.
C) on select composites as part of the firm wide verification.
The correct answer was A.
Section III.C: After the firm has been verified, as evidenced by a verification report, it may additionally choose to have a detailed Performance Examination conducted on one or more specific composites
I don’t see this anywhere. Could someone expand on this?